Each building can be extended up to a size of 10,000m². A further 10,000 m² is added to the basic value per level. This upper limit is then lifted from level 5. However, an additional building permit is required every 20,000m².
For every 20m² of production area, 1 employee can be employed in a factory; in all other production buildings, 50m² is required. the production area must be at least as large as the storage area

Start warehouse slots: 3 (the factories 4)

  • Slot expansion:
    • maximum 10 warehouse slots + 5 per current level
    • Price: old number of slots x 1000€
    • Duration: old number of slots x 20h

Start production slots: 1

  • Slot expansion:
    • maximum 5 production slots + 2 per current level
    • Price: old number of slots x 4000€
    • Duration: old number of slots x 40h
Attention: Please refer to the following section for the distribution of employees!

See also Employees#Work slots


The classification of the individual factory workers :

Stage 1 Stage 2 Stage 3 Stage 4 Stage 5

Laborer

Workers

Skilled worker

Technicians

Engineers

Factory Fish factory
Boot factory
Clothing factory
Toy factory
Sports equipment factory
Building materials factory
Furniture factory
Car factory
Hightech factory
Pharmaceutical company
Refinery
Jewelry manufacture
Basic wage +10% +20% +30% +40%



Agricultural building Level 0

  • Employees: Rancher
  • Extension costs: 100,-€ per m²
  • Construction time & closed extension: 162sek per m² (4,5h per 100m²)
  • Extension time with open building: 324sek per m² (9h per 100m²)
  • Minimum building size: 50m² production area / 20m² warehouse

Products to be produced here:

  • Employees: Farmer
  • Extension costs: 100,-€ per m²
  • Construction time & closed extension: 162sek per m² (4,5h per 100m²)
  • Extension time with open building: 324sek per m² (9h per 100m²)
  • Minimum building size: 50m² production area / 20m² warehouse

Products to be produced here:


  • Employees: Farmer
  • Extension costs: 200,-€ per m²
  • Construction time & closed extension: 162sek per m² (4,5h per 100m²)
  • Extension time with open building: 324sek per m² (9h per 100m²)
  • Minimum building size: 50m² production area / 20m² warehouse

Products to be produced here:


Factory building Level 0

  • Employees: Laborer
  • Extension costs: 100,-€ per m²
  • Construction time & closed extension: 324sek per m² (4,5h per 100m²)
  • Extension time with open building: 648sek per m² (9h per 100m²)
  • Minimum building size: 50m² production area / 20m² warehouse

Products to be produced here:

Endprodukte

Food

Fruit and vegetables

Drinks

Kiosk goods

Baked goods

Meat products

Drugstore articles

Zoo articles (Level 2)

Electrical goods

Flower store

Gas station

Intermediate products


Agricultural building Level 1

  • Employees: Fisherman
  • Extension costs: 200,-€ per m²
  • Construction time & closed extension: 162sek per m² (4,5h per 100m²)
  • Extension time with open building: 324sek per m² (9h per 100m²)
  • Minimum building size: 50m² production area / 20m² warehouse

Products to be produced here:

  • Employees: Lumberjack
  • Extension costs: 200,-€ per m²
  • Construction time & closed extension: 162sek per m² (4,5h per 100m²)
  • Extension time with open building: 324sek per m² (9h per 100m²)
  • Minimum building size: 50m² production area / 20m² warehouse

Products to be produced here:


Mines Level 1

  • Employees: Miner
  • Extension costs: 200,-€ per m²
  • Construction time & closed extension: 324sek per m² (9h per 100m²)
  • Extension time with open building: 648sek per m² (18h per 100m²)
  • Minimum building size: 50m² production area / 20m² warehouse

Products to be produced here:

  • Employees: Miner
  • Extension costs: 200,-€ per m²
  • Construction time & closed extension: 324sek per m² (9h per 100m²)
  • Extension time with open building: 648sek per m² (18h per 100m²)
  • Minimum building size: 50m² production area / 20m² warehouse

Products to be produced here:

  • Employees: Miner
  • Extension costs: 200,-€ per m²
  • Construction time & closed extension: 324sek per m² (9h per 100m²)
  • Extension time with open building: 648sek per m² (18h per 100m²)
  • Minimum building size: 50m² production area / 20m² warehouse

Products to be produced here:


Factory building Level 1

  • Employees: Worker
  • Extension costs: 200,-€ per m²
  • Construction time & closed extension: 324sek per m² (9h per 100m²)
  • Extension time with open building: 648sek per m² (18h per 100m²)
  • Minimum building size: 50m² production area / 20m² warehouse

Products to be produced here:

  • Employees: Worker
  • Extension costs: 200,-€ per m²
  • Construction time & closed extension: 324sek per m² (9h per 100m²)
  • Extension time with open building: 648sek per m² (18h per 100m²)
  • Minimum building size: 50m² production area / 20m² warehouse

Products to be produced here:


  • Employees: Worker
  • Extension costs: 200,-€ per m²
  • Construction time & closed extension: 324sek per m² (9h per 100m²)
  • Extension time with open building: 648sek per m² (18h per 100m²)
  • Minimum building size: 50m² production area / 20m² warehouse

Products to be produced here:


Factory building Level 2

  • Employees: Skilled worker
  • Extension costs: 300,-€ per m²
  • Construction time & closed extension: 324sek per m² (9h per 100m²)
  • Extension time with open building: 648sek per m² (18h per 100m²)
  • Minimum building size: 50m² production area / 20m² warehouse

Products to be produced here:

  • Employees: Skilled worker
  • Extension costs: 300,-€ per m²
  • Construction time & closed extension: 324sek per m² (9h per 100m²)
  • Extension time with open building: 648sek per m² (18h per 100m²)
  • Minimum building size: 50m² production area / 20m² warehouse

Products to be produced here:


Factory building Level 3

  • Employees: Technician
  • Extension costs: 400,-€ per m²
  • Construction time & closed extension: 324sek per m² (9h per 100m²)
  • Extension time with open building: 648sek per m² (18h per 100m²)
  • Minimum building size: 50m² production area / 20m² warehouse

Products to be produced here:

  • Employees: Technician
  • Extension costs: 400,-€ per m²
  • Construction time & closed extension: 324sek per m² (9h per 100m²)
  • Extension time with open building: 648sek per m² (18h per 100m²)
  • Minimum building size: 50m² production area / 20m² warehouse

Products to be produced here:


Mines Level 4

  • Employees: Miner
  • Extension costs: 500,-€ per m²
  • Construction time & closed extension: 324sek per m² (9h per 100m²)
  • Extension time with open building: 648sek per m² (18h per 100m²)
  • Minimum building size: 50m² production area / 20m² warehouse

Products to be produced here:


Factory building Level 4

  • Employees: Engineer
  • Extension costs: 500,-€ per m²
  • Construction time & closed extension: 324sek per m² (9h per 100m²)
  • Extension time with open building: 648sek per m² (18h per 100m²)
  • Minimum building size: 50m² production area / 20m² warehouse

Products to be produced here:

  • Employees: Engineer
  • Extension costs: 600,-€ per m²
  • Construction time & closed extension: 324sek per m² (9h per 100m²)
  • Extension time with open building: 648sek per m² (18h per 100m²)
  • Minimum building size: 50m² production area / 20m² warehouse

Products to be produced here:


  • Employees: Engineer
  • Extension costs: 500,-€ per m²
  • Construction time & closed extension: 324sek per m² (9h per 100m²)
  • Extension time with open building: 648sek per m² (18h per 100m²)
  • Minimum building size: 50m² production area / 20m² warehouse

Products to be produced here:


Factory building Level 5

  • Employees: Engineer
  • Extension costs: 2000,-€ per m²
  • Construction time & closed extension: 324sek per m² (9h per 100m²)
  • Extension time with open building: 648sek per m² (18h per 100m²)
  • Minimum building size: 50m² production area / 20m² warehouse

Products to be produced here:

  • Employees: Engineer
  • Extension costs: 500,-€ per m²
  • Construction time & closed extension: 324sek per m² (9h per 100m²)
  • Extension time with open building: 648sek per m² (18h per 100m²)
  • Minimum building size: 50m² production area / 20m² warehouse

Products to be produced here: