Hightech factory

Aus P&T-Wiki
Wechseln zu: Navigation, Suche
deutsche version

Hightech factory (4)

Gebaeude 58.png


  • Category: Factory
  • Available from Level: 4
  • Employees: Engineer
  • Extension costs: 500,-€ per m²
  • Construction time & closed extension: 324sek per m² (9h per 100m²)
  • Extension time with open building: 648sek per m² (18h per 100m²)
  • Minimum building size: 50m² production area / 20m² warehouse
  • Start storage slots:: 4
  • Start production slots: 1
  • required m² per MA: 20
  • maximum workers per production line: 500


Products to be produced here: