Gem mine
Gem mine (4)
- Category: Mines
- Available from Level: 4
- Employees: Miner
- Extension costs: 500,-€ per m²
- Construction time & closed extension: 324sek per m² (9h per 100m²)
- Extension time with open building: 648sek per m² (18h per 100m²)
- Minimum building size: 50m² production area / 20m² warehouse
- Start storage slots:: 3
- Start production slots: 1
- required m² per MA: 50
- maximum workers per production line: 200
Products to be produced here:
|