Gem mine

Aus P&T-Wiki
Wechseln zu: Navigation, Suche
deutsche version

Gem mine (4)

Gebaeude 43.gif


  • Category: Mines
  • Available from Level: 4
  • Employees: Miner
  • Extension costs: 500,-€ per m²
  • Construction time & closed extension: 324sek per m² (9h per 100m²)
  • Extension time with open building: 648sek per m² (18h per 100m²)
  • Minimum building size: 50m² production area / 20m² warehouse
  • Start storage slots:: 3
  • Start production slots: 1
  • required m² per MA: 50
  • maximum workers per production line: 200


Products to be produced here:


more mines: