Renovation

Aus P&T-Wiki
Wechseln zu: Navigation, Suche

From a company value of 5.000.000€, the condition of the buildings decreases periodically and they must be repaired regularly and at a charge. Every night by 0.01 the building value is reduced by 0.2 %. This also leads to a deterioration in the quality of work in the amount of the wear and tear.

Production buildings therefore only produce 99.0% of the possible quantity after 5 days (-0.2% output per day).

In stores, the maximum sales quantity and the factor growth per employee decrease equivalently.

Poor building condition reduces the storage space in warehouses.

The renovation costs correspond to the loss in value to be made up.

The renovation of a building with a value of €1,000,000 is therefore after 5 days:

1.000.000€ * (0.2/100) * 5 = 10.000€ (2.000€ per day)