Warehouse: Unterschied zwischen den Versionen

Aus P&T-Wiki
Wechseln zu: Navigation, Suche
(Cooling Warehouse)
Zeile 28: Zeile 28:
 
Start storage slots: 2
 
Start storage slots: 2
 
*Slot expansion:
 
*Slot expansion:
**maximum 10 storage slots + 5 per current level
+
**maximum of 10 storage slots + one additional storage slot for each additional BG used + 5 per current level
 
**Price: old number of slots x 1000€
 
**Price: old number of slots x 1000€
 
**Duration: old number of slots x 20h
 
**Duration: old number of slots x 20h

Version vom 18. Februar 2025, 10:42 Uhr

Warehouse

Gebaeude 80.gif

  • Construction costs per m²: 90 €
  • Construction time & closed extension: 324sec per m² (9h per 100m²)
  • Expansion time with open building: 648sec per m² (18h per 100m²)

Start storage slots: 2

  • Slot expansion:
    • maximum of 10 storage slots + one additional storage slot for each additional BL used + 5 per current level
    • Price: old number of slots x 1000€
    • Duration: old number of slots x 20h
  • Employees in warehouses:
    • with training level 1 and the maximum number of employees, the built warehouse space can be used
    • the better the training level of the employees, the more m² you can use that you have not built.
    • Example: an employee with training level 10 can manage a storage area of 136m² with a built storage area of 100m”.

Cooling Warehouse

Gebaeude 81.gif

  • Construction costs per m²: 120 €
  • New construction time & closed extension: 324sec per m² (9h per 100m²)
  • Extension time with open building: 648sec per m² (18h per 100m²)

Start storage slots: 2

  • Slot expansion:
    • maximum of 10 storage slots + one additional storage slot for each additional BG used + 5 per current level
    • Price: old number of slots x 1000€
    • Duration: old number of slots x 20h
  • Employees in warehouses:
    • with training level 1 and the maximum number of employees, the built storage area can be used
    • the better the training level of the employees, the more m² you can use that you have not built.
    • Example: an employee with training level 10 can manage a storage area of 136m² with a built storage area of 100m”.
  • The shelf life of chilled goods decreases half as quickly for the time they are stored in the cooling warehouse. This is illustrated by the doubled shelf life.
  • Caution: live animals do not like the cold!
  • To cool goods in other buildings, see cold room