Warehouse
Warehouse
- Construction costs per m²: 90 €
- New construction time & closed extension: 324sec per m² (9h per 100m²)
- Expansion time with open building: 648sec per m² (18h per 100m²)
Start storage slots: 2
- Slot expansion:
- maximum of 10 storage slots + one additional storage slot for each additional BL used + 5 per current level
- Price: old number of slots x 1000€
- Duration: old number of slots x 20h
- Employees in warehouses:
- with training level 1 and the maximum number of employees, the built warehouse space can be used
- the better the training level of the employees, the more m² you can use that you have not built.
- Example: an employee with training level 10 can manage a storage area of 136m² with a built storage area of 100m”.
Cooling Warehouse
- Construction costs per m²: 120 €
- New construction time & closed extension: 324sec per m² (9h per 100m²)
- Expansion time with open building: 648sec per m² (18h per 100m²)
Start storage slots: 2
- Slot expansion:
- maximum of 10 storage slots + one additional storage slot for each additional BG used + 5 per current level
- Price: old number of slots x 1000€
- Duration: old number of slots x 20h
- Employees in warehouses:
- with training level 1 and the maximum number of employees, the built storage area can be used
- the better the training level of the employees, the more m² you can use that you have not built.
- Example: an employee with training level 10 can manage a storage area of 136m² with a built storage area of 100m”.
- The shelf life of chilled goods decreases half as quickly for the time they are stored in the cooling warehouse. This is illustrated by the doubled shelf life.
- Caution: live animals do not like the cold!
- To cool goods in other buildings, see cold room